Subscribe via RSS for new articles on cabling standards, testing and infrastructure delivery.
- Server Room
- Comms Room
Comms Room vs Server Room — What's the Difference?
For M&E and fit-out contractors — when a project needs a comms room build vs a full server room, and what cabling scope each typically includes.
Read article- Fibre Optic
- Testing
OTDR Testing Explained
What OTDR fibre testing is, when estates and consultants require it, and what should be in a fibre handover pack for UK commercial and logistics projects.
Read article- Data Cabling
- Pricing
Structured Cabling Cost UK — What Affects Pricing
What drives structured cabling costs on UK commercial projects — cable type, containment, building layout and certification. A planning guide for M&E contractors, not a fixed quote.
Read article- Subcontracting
- M&E
How to Choose a Data Cabling Subcontractor
What M&E and fit-out contractors should verify before appointing a structured cabling subcontractor — certifications, testing, RAMS, documentation and supply-chain fit.
Read article- Server Room
- Handover
Server Room Handover Checklist
What M&E contractors and IT teams should verify before signing off a comms room build — racks, patching, labelling, power, testing and documentation.
Read article- Fibre Optic
- Data Cabling
Fibre vs Copper for Commercial Networks
When to specify fibre optic backbone versus copper structured cabling in UK commercial fit-outs — cost, distance, bandwidth and maintenance considerations for M&E contractors.
Read article- Data Cabling
- Cat6A
What is Cat6A?
Cat6A supports 10 Gigabit Ethernet to 100 metres — when it is worth specifying over Cat6, and what contractors should expect on site.
Read article