Containment & Infrastructure

Cable Containment & Site Infrastructure

Cable Containment Installation UK | Tray, Conduit & Trunking

Neat Cat6 cabling runs in metal basket tray, ceiling infrastructure installation
Industrial cable entry and containment in a utility vault installation

AYT Infrastructure delivers the containment and routing infrastructure that structured cabling depends on — tray and basket, conduit and trunking, floor boxes and risers — installed to drawing, labelled and ready for cable pull.

What we install

  • Cable tray, basket and ladder rack
  • PVC, steel and flexible conduit
  • Dado and perimeter trunking
  • Underfloor floor boxes and grommets
  • Vertical riser cabling routes
  • Overhead and underfloor cable routes
  • Penetration preparation and sealing coordination
  • Labelling and route documentation

With specialist partners

  • Certified fire-stopping systems where a specialist contractor is specified on the project

Our process

  1. Survey & Route Planning
  2. Containment First Fix
  3. Floor Boxes & Riser Preparation
  4. Cable Pull Readiness Check
  5. As-Built Route Documentation

Common Questions

Frequently Asked Questions

Do you install containment as part of a wider cabling package?

Yes. Containment is typically delivered as part of our first-fix scope on data cabling and fibre projects — or as a standalone package where drawings and routes are already defined.

Can you work to the main contractor's containment specification?

We install to project drawings and the appointed specification — including tray, basket, ladder rack, conduit and trunking systems from major UK manufacturers.

Do you handle fire stopping at penetrations?

We coordinate fire stopping at cable penetrations through fire-rated walls and floors. Where a specialist fire-stopping contractor is specified, we work to their method statements and inspection records.

UK Coverage

Where we deliver this service

Nationwide mobilisation with primary coverage in major UK regions. Explore location pages for regional programme support and subcontractor availability.

Let's Talk

Planning a containment & infrastructure project?

Share your drawings or site details and we'll return a clear, competitive quote — with full Fluke certification included.

Typically respond within 4 business hours.